top of page



Lessons Learned: Barrier Management for Aquaculture in Exposed Areas
Over the past few years, ORS has been providing barrier management support to multiple innovative fish farming concepts in exposed areas....

Per Ståle Larsen | Principal Consultant
Oct 20, 20203 min read


How to get the most out of online risk assessment workshops
As a result of the ongoing COVID-19 outbreak, ORS has facilitated multiple online multidisciplinary risk assessment workshops, such as...

Thomas Solberg Fylking | Principal Consultant
Oct 15, 20203 min read


Reliability, Availability and Maintainability Study (RAMS Analysis)
In this article: What is a RAM analysis? The objective of RAMS analysis Methodology for RAM study Establish a RAM study basis Required...

Marcio Pinheiro | Senior Consultant
Oct 10, 20203 min read


Functional Safety Assessment and the Lessons Learned from Them - Safety Requirements
Over the last few years, ORS has conducted multiple Functional Safety Assessments (FSAs). These have been for new development projects,...

Thomas Solberg Fylking | Principal Consultant
Oct 1, 20206 min read


Risikobasert obsolethåndtering for offshore installasjoner
Offshore installasjoner på norsk sokkel designes for lang levetid, og en rekke aldrende plattformer gjennomgår program for...

ORS
Sep 29, 20202 min read


Lessons learned from FSA
Over the last few years, ORS has conducted multiple Functional Safety Assessments (FSAs) for major greenfield projects, brownfield...

Thomas Solberg Fylking | Principal Consultant
Sep 25, 20205 min read


Quantifying Uncertainties in LOPA
In this article: Introduction to LOPA: Layer of Protection Analysis Installation Specific Conservativeness Statistical Distributions to...

ORS
Sep 20, 20207 min read


Sikkerhetsinstrumenterte systemer i drift
Driftsfasen for et sikkerhetsinstrumentert system strekker seg ofte over flere år. Selv om denne fasen er minst like viktig som...

Thomas Solberg Fylking | Principal Consultant
Sep 15, 20202 min read


System response to safety transmitter signal error
Large and complex process facilities are dependent on a well-functioning safety and automation system for safe and reliable asset...

ORS
Sep 10, 20202 min read

SUBSCRIBE TO OUR NEWS & INSIGHTS
bottom of page