top of page

ORS CONSULTING
Insights


Functional Safety Assessment and the Lessons Learned from Them - Safety Requirements
Over the last few years, ORS has conducted multiple Functional Safety Assessments (FSAs). These have been for new development projects,...

Thomas Solberg Fylking | Principal Consultant
Oct 1, 20206 min read


Risikobasert obsolethåndtering for offshore installasjoner
Offshore installasjoner på norsk sokkel designes for lang levetid, og en rekke aldrende plattformer gjennomgår program for...

ORS
Sep 29, 20202 min read


Lessons learned from FSA
Over the last few years, ORS has conducted multiple Functional Safety Assessments (FSAs) for major greenfield projects, brownfield...

Thomas Solberg Fylking | Principal Consultant
Sep 25, 20205 min read


Quantifying Uncertainties in LOPA
In this article: Introduction to LOPA: Layer of Protection Analysis Installation Specific Conservativeness Statistical Distributions to...

ORS
Sep 20, 20207 min read


Sikkerhetsinstrumenterte systemer i drift
Driftsfasen for et sikkerhetsinstrumentert system strekker seg ofte over flere år. Selv om denne fasen er minst like viktig som...

Thomas Solberg Fylking | Principal Consultant
Sep 15, 20202 min read


System response to safety transmitter signal error
Large and complex process facilities are dependent on a well-functioning safety and automation system for safe and reliable asset...

ORS
Sep 10, 20202 min read


Integrated design review – a method to scrutinize project interfaces
In several offshore projects, mistakes and design errors can be traced back to missing or incorrect interface information. This will in...

Emil Hoffmann | Principal Consultant
Sep 1, 20202 min read


Using FMEA – application for complex safety system
FMEA is another vital tool in ensuring process safety. You can use a modified FMEA (Failure Modes and Effects Analysis) to ensure the...

Baris Arslan | Principal Consultant
Aug 31, 20204 min read


SIS lifecycle management planning and the importance of it
In this article: Why SIS lifecycle management planning is vital Planning of SIS activities Creating the FSMP Most facilities in the...

Morten N. Pettersen | Principal Consultant
Aug 26, 20206 min read

SUBSCRIBE TO OUR NEWS & INSIGHTS
bottom of page